
Part one
1. Basic situation of the project
1.Project name:
Application of AI agents in neuro-tumor diagnosis and treatment
2. Project number:
JF-HW-2026-D002
3. Project location: Jinfeng Laboratory
4. Procurement method: inquiry
2. Procurement content
serial number | Goods name | Configuration requirements | quantity | Unit price limit (Yuan) | Remark |
1 | MSI EdgeXpert GB10 | Brand model: MSI EdgeXpert GB10 Architecture: NVIDIAR Grace Blackwell GPU: NVIDIAR Blackwell Architecture CPU: 20-core Arm CPU10xCortex-X92510xCortex-A725 designed for AI workloads Memory: 128GB unified LPDDR5x memory Blackwell architecture memory bandwidth: 273GB/s [High bandwidth, low power consumption system memory] Hard drive: 4TB NVMe M.2 SSD supports self-encryption Interface: 4xUSB 3.2Gen2Type-C data transfer speed up to 20Gb/s Network card: 10Gbe Ethernet built-in smart NIC network card supports NCCL, RoCEGPUDirect's ConnectX-7 + wireless WIFI7 One-year warranty | 2 | 36000 | |
2 | ASUS/ASUS Ascent GX10 | Processor: ARM v9.2-A CPU (GB10) Memory: 128 GB LPDDR5x, unified system memory Hard drive: 1TB NVMe M.2 SSD Interface: 3 x USB 3.2 Gen 2x2 Type-C, 20Gbps, supports DisplayPort2.1 1 x USB 3.2 Gen 2x2 Type-C, 20Gbps, supports DisplayPort2.1, supports PDin (180W EPR PD3.1 SPEC) 1 x HDMI 2.1 Network card: 1 x 10G LAN | 2 | 34000 | |
3 | Intelligent computing management platform | Configure a set of platform software based on the Kubernetes+Docker+GPU architecture to position the upper-layer application of machine learning, saving customers the trouble of writing code and quickly starting deep learning tasks. The software is based on containers and has a variety of built-in deep learning frameworks. It has fine-grained permission control, complete data and image storage and isolation, and provides a variety of interactive development and API interfaces to meet the needs of multiple users and multiple scenarios. Manage the resources and users of the entire system to achieve centralized management and unified allocation of computing resources, such as centralized management and allocation of CPU, GPU, memory, storage and other resources. User-side resources are isolated from each other, and computing resources are dynamically allocated and recycled in a job-based manner. HPC resource management module HPC resource management. After creating an HPC task through the command line, the platform checks whether the partition, project and personal quotas meet the requirements. If the task resources are over-provisioned, the task will be deleted. The administrator can enable the interactive task running time limit. When the interactive task running time exceeds the limit, the platform deletes the task and releases the resources.; Administrators can set a limit on the number of interactive tasks. When the number exceeds the limit, users cannot submit interactive tasks. ; Administrators can configure interactive task resource templates. When users submit interactive tasks, a single task cannot exceed the template resource limit. ; Administrators can view the idle time of interactive tasks and delete tasks that have been idle for too long. Hardware resource sharing component Supports sharing functions based on underlying basic hardware. Basic hardware sharing is supported by hardware-based algorithms. Sharing requirements provide 1/2, 1/4, and 1/8 functions and provide screenshots of actual software functions. | 1 | 0 | additional |
3. Business requirements
1. Delivery time: Delivery of all goods and completion of acceptance within 7 days after signing the contract;
2. Service location: Jinfeng Laboratory, No. 313 Jinyue Road, Chongqing High-tech Zone;
3. Payment method: Settlement will be processed after the installation is completed and acceptance is passed. After formal settlement, the entire payment will be paid in one go.
4. Total project price limit: The total quotation price shall not exceed the limit price of 140,000 yuan. The quoted price is a comprehensive lump sum price, including all equipment fees, software fees, installation fees, testing fees, travel expenses, freight, material fees, taxes, etc. The purchaser will not pay other fees separately.
4. Project requirements
1. The products supplied are all in the original packaging, without opening, scratching, bumping or deformation.; Materials such as factory certificates/test reports are provided with the goods to meet the requirements for scientific research warehousing, accounting, and audit archiving.
2. The packaging must be shockproof, moisture-proof, anti-static, and anti-collision buffering.; If the product is damaged during transportation or has abnormal functions, the supplier will replace it with qualified products of the same specification free of charge without any conditions.
3. The goods shall be delivered to the designated location of the laboratory within the agreed period without any unreasonable delay. After passing the acceptance inspection, you will enjoy a 1-year warranty. ; During the warranty period, free warranty and technical support will be provided for non-human quality problems.
5. Supplier qualification requirements
(1) Meet the qualifications of Article 22 of the "Government Procurement Law of the People's Republic of China":
1. Have the ability to independently bear civil liability;
2. Have good business reputation and sound financial accounting system;
3. Have the necessary equipment and professional technical capabilities to perform the contract;
4. Have a good record of paying taxes and social security funds in accordance with the law;
5. In the three years before participating in government procurement activities, there are no major illegal records in business activities.;
6. Other conditions stipulated by laws and administrative regulations.
Note: Paragraph 1 requires a business license, organization code certificate and tax registration certificate or public institution legal person certificate. If the three certificates are combined into one, only a business license is required.; Paragraphs 2-6 provide a declaration (see declaration for details).
6. Inquiry schedule
1. Inquiry release time: 17:00 on July 7, 2026
2. Inquiry deadline: 17:00 on July 10, 2026
Suppliers should send the quotation list and relevant attachments (which must be stamped with the official seal and scanned in color) to the contact email wangyanli@jflab.ac.cn before the inquiry deadline. Those who do not quote before the inquiry deadline will be deemed to have automatically given up.
Supplier quotation documents should include the following attachments (see Part 2 for details):
(1) Quotation letter;
(2) Quotation list;
(3) Legal representative qualification certificate (if the bidder is an authorized representative, he must also provide a legal representative authorization letter);
(4) Copy of business license or other organization certification documents;
(5) Statement;
(6) Letter of commitment;
7. Requirements for signature and sealing of quotation documents
1. The bidder should prepare a freshly stamped quotation document (PDF) and send it to the mailbox. The quotation document must be clearly visible, otherwise the quotation will be deemed invalid.
2. The quotation document should be produced in accordance with the requirements of the "Inquiry Announcement". The quotation document must be signed and sealed by the legal representative of the bidder or his authorized representative at the prescribed signature place. The signature, seal and content should be complete. If there are any omissions, you will bear the risk of being regarded as an invalid quotation.;
3. The quotation document should be written clearly and neatly. Any insertions, alterations, additions or deletions between the lines must be signed or stamped with a personal seal by the legal representative of the bidder or his authorized representative. Quotation documents that are illegible, unclearly expressed, or may lead to non-unique understanding will be deemed invalid.